BIG CHANGES HAPPENING!!

The entrance to this bathroom was formally from the main lobby/entrance area of the home.  In redesigning the bathroom, the existing door was blocked off and a new door was positioned around the corner in a corridor, giving more direct access from the bedrooms and more privacy away from the main-entrance area.    The tub was removed and replaced with a fully tiled wall shower.   The toilet was moved to the wall directly opposite, where the existing door had been located.  The new vanity, with its quartz countertop, rectangular undermount sink and black and chrome faucet looks stunning!!  BIG changes!!