Moving toward…WOW!

We are excited to watch the renovation of this family room moving toward completion.

Stage 1

Kitchen On Tour – Before & After

This room’s original fireplace was off-center, which would not accommodate the new design featuring balanced cabinetry on either of the fireplace.

Stage 2

Kitchen On Tour – Before & After

The existing wall was removed and a brand-new one was created to allow center placement of the fireplace-TV unit.

Stage 3

Kitchen On Tour – Before & After

An elongated modern electrical fire insert will replace the pre-existing gas unit.  The recessed area in the wall was designed to allow the homeowners’ TV to be flush-mounted. 

Stage 4

Kitchen On Tour – Before & After

Stunning 24 x 48 porcelain tiles have been used floor to ceiling surrounding the fireplace and TV.

The addition of base cabinets & floating shelves installed on either side of the fireplace will complete the stunning updated look!

Almost Complete!

Going Green with Dekton

Our Dekton countertop and wall cladding has arrived!  We are expressing a huge thank you to DPS Countertops for their stellar manufacturing and installation, also to Cosentino for supplying our Dekton product.

Read More »